Case Study

Chevron Towers Perth

Chevron Towers Perth

Chevron Towers Perth Case Study Data

LOCATION: Perth, Western Australia
SQUARE METERS: 65,000 (Modular wiring)
CONTRACTOR/CLIENT: Fredon WA
START DATE: 2021
COMPLETION DATE: 2022

PROJECT SCOPE:
Accessory Connections – GPO’s: 6,740
Light Fittings: 6,500
Multi Circuit Home Run Cables / Panel Mounts: 345
Switch Connections: N/A

STAGE 01: Board ConnectionsSTAGE 02: Corridor Wiring
STAGE 03: Filed WiringSTAGE 04: Accessories

Collaborative Approach

Fredon took a collaborative early design approach for this project and proposed the modular wiring solution to achieve desired outcomes. The services team led an integrated approach with the key electrical service providers as stakeholders to develop an active process including:

WHY APEX & OUTCOMES

Fredon WA have used the Apex Modular Wiring Systems on previous projects and the Project team was eager to use it again for this project. Their need was to achieve a swift programme timeline on a repeatable floor plan over 28 floors. The Challenges were labour and time for the installation for this project. Key Selection Criteria to reduce the RISK factors of electrical services in design and onsite. The specific objectives were identified as:

Fredon achieved the desired timeline targets with a collaborative approach. The modular wiring installation providing a standarised and repeatable method for installations.

thought about using modular Wiring?

Apex Modular Wiring can reduce installation times by up to 70%